HAYDAR ALİYEV CULTURE CENTER
BAKU / AZERBAIJAN (2006-2012)
Project Manager at DIA HOLDING
57.519 m2 Construction area, 11.292 m2 Landscape area, 300.000.000USD Project Cost, 8.500.000 Visitors per year
Mr. Kadıoglu has started his Professional carrier during his university years. Before establishing his own company, he contributed implementation of leading projects in the world, both in design and construction stages. The experiences he gained from these works are the cornerstones of his company. Mr. Kadioglu, who managed to fit many construction and design of hotels, private palaces and airports in his professional career into a short period, appraises Heydar Aliyev Cultural Center, the unique architecture of the famous designer Zaha Hadid, as a masterpiece.
ANTALYA INTERNATIONAL AIRPORT 2
ANTALYA / TURKEY
Construction Manager at IC HOLDING
91.460 m2 Construction area, 185.000 m2 Landscape area, 162.000.000USD Project Cost
INTERNATIONAL AIRPORT HOTEL
ANTALYA / TURKEY
Designer & Site Manager at IC HOLDING
18.500 m2 Construction area, 57.000 m2 Landscape area, 14.000.000USD Project Cost, Capacity; 4 Stars – 380 beds
GREEN PALACE HOTEL
ANTALYA / TURKEY
Finishing Works Chief at IC HOLDING
60.000 m2 Construction area, 100.000 m2 Landscape area, 30.000.000USD Project Cost, Capacity; 5 Stars / 1400 beds
The interior design of Green Palace Hotel, which has a construction area of 60.000 m2, is completely inspired by sophisticated and modern lines and is created with touches reflecting the vibes of the Antalya.
SANTAI HOTEL
ANTALYA / TURKEY
Construction Manager at IC HOLDING
32.000 m2 Construction area, 94.000 m2 Landscape area, 36.000.000USD Project Cost
The interior design of Santai Hotel, which has a construction area of 32.000 m2, is completely inspired by sophisticated and modern lines
and is created with touches reflecting the vibes of the Antalya.